Schedule and Journal

Meetings

Regular meetings and project touchpoints.

Meeting Cadence Notes
TA meeting Weekly on Tuesdays, 10:30-11:00 a.m. Last completed meeting: October 20, 2026. Weekly progress, testing, documentation, and upcoming course deliverables were reviewed.
Client meeting As scheduled with Nick Dokich Last completed meeting: October 21, 2026. The team discussed Adcut and showed Nick Dokich the development repository. An earlier client meeting was held October 14. September 15 and 18 meetings did not take place because of technical difficulties.
Team meeting Weekly, coordinated by the team Used for implementation planning, deliverable updates, and task ownership.

Team E Project Journal

Journal of Meetings and Decisions

Most recent entries appear first. Each team, client, and professor/manager meeting is recorded with a concise summary of discussions, problems, decisions, and action items when provided.

Weekly progress reports follow the TA's Progress, Plans, and Problems format. The TA notes call for an update by 11:59 p.m. the day before the regular meeting slot, including weeks without a meeting, and an email confirmation with the website link.

Client meeting - Adcut discussion and repository demonstration

Discussion: Team E met with Nick Dokich to discuss Adcut and showed him the public development repository.

Demonstration context: At the time of the meeting, the repository contained the local Streamlit workflow, color-separated SVG tracing, SVG and DXF export, automated tests, cross-platform setup, and documentation of the vectorization pipeline.

Open issues at the time: Representative client artwork, accepted CAD references, exact DXF conventions, AutoCAD or IGEMS import validation, and a supervised cutting test were still outstanding.

Recorded outcome: No additional client approval, technical decision, or assigned follow-up from this meeting is documented in the available project records.

Weekly TA meeting - testing and documentation planning

Progress: The team reviewed the running Streamlit workflow, the cross-platform automated test matrix, and the remaining client-validation work. The development board now separates completed implementation milestones from open geometry and acceptance tasks.

Decisions: The team will document the actual vectorization pipeline, keep generated output labeled as unvalidated for fabrication, and prepare the course test, documentation, and client handoff plans.

Plans: Publish D3, the documentation plan, the user manual, and the handoff plan. Prepare the image-vectorization tech talk and a repeatable demonstration with repository samples.

Problems: Representative client artwork, accepted CAD references, exact DXF conventions, AutoCAD/IGEMS validation, and a supervised cutting test remain unavailable.

Client meeting - project check-in

Confirmed record: Team E met with Nick Dokich for a client meeting.

Project status at the time: The development build used VTracer spline-mode SVG tracing, retained Bezier curves as native DXF SPLINE entities, used uv for dependency management, and ran automated checks across Windows, Linux, macOS, and Python 3.11-3.13.

Outstanding project questions: The team still needed representative artwork and accepted CAD output, along with confirmation of units, scale, layer conventions, circle and arc tolerances, and downstream AutoCAD or IGEMS compatibility.

Documentation note: Detailed discussion, decisions, and assigned action items from this meeting are not present in the available notes, so none are attributed here.

Weekly TA meeting - native curves and project tracking

Progress: The team replaced segmented contour output with VTracer spline-mode SVG tracing. Cubic and quadratic Bezier paths now remain curves and export as native DXF SPLINE entities. uv dependency management, a committed lockfile, and Windows, Linux, and macOS CI for Python 3.11-3.13 were added.

Decisions: SVG is the structured intermediate representation. Pillow remains responsible only for decoding and normalization, while VTracer performs tracing. Work is tracked on the public GitHub project board.

Plans: Test representative artwork, confirm the DXF contract with Adcut, and continue topology and circle/arc work after acceptance criteria are available.

Problems: Native splines improve curve quality but do not by themselves resolve exact circles, circular arcs, holes, or duplicate shared cut edges.

Weekly TA meeting - midterm and runnable build review

Progress: The team reviewed the midterm presentation, D1 specifications, D2 design document, original sample artwork, and the first runnable image-to-CAD build.

Decisions: Team E's public development repository remains the source of record. Development outputs are review artifacts until dimensions, layers, geometry, and downstream imports are validated.

Plans: Improve curve quality, standardize setup with uv, expand tests across operating systems and Python versions, and move implementation work onto the GitHub project board.

Problems: The first tracing approach produced many short segments and did not yet meet the goal of native CAD curves.

Weekly progress report - working conversion build and midterm preparation

Progress: Incorporated the supplied follow-up feedback on circles and arcs, preferred CAD outputs, partial PDF selection, and scaling quality. Published the midterm presentation and the D2 design document. The public development repository now contains a runnable local Streamlit application that accepts JPEG, PNG, WEBP, GIF, and PDF files; performs configurable color reduction; traces closed foreground paths; previews boundaries; and exports SVG and DXF. Three original test images were added. Fourteen automated tests, formatting checks, and the Windows GitHub Actions run pass. The generated sample DXF was also opened and audited successfully with three closed polyline entities and no reported DXF errors. This is a progress update, not a meeting record.

Decisions: Team E's public repository is the active development source. Original geometric samples are used for repeatable testing; the official UNC identity download page is linked as an optional source whose usage restrictions still apply. Generated CAD output must remain a review artifact and must not be sent to cutting equipment until downstream compatibility and geometry quality are validated.

Plans: Have team members run the documented Windows setup and test the application with the included samples. Obtain permitted client artwork and accepted CAD examples, confirm units and DXF conventions, and test imports in the client's actual AutoCAD or IGEMS workflow. Continue with shared-edge cleanup and circle/arc fitting after acceptance criteria are confirmed.

Problems: The first build exports closed polylines but does not yet fit native circles or arcs, deduplicate shared boundaries, or provide manual path editing. PDF processing currently uses the first page, and GIF processing uses the first frame. AutoCAD, IGEMS, water-jet, and client acceptance testing have not yet been completed. Nick's supplied repository currently contains only its initial README and was not changed.

Weekly progress report - requirements received

Progress: The client emailed responses to ten topics of requirements questions to the team. The D1 draft is also updated to reflect the client's responses. This is a progress update, not a meeting record.

Plans: Another client meeting has been proposed for the week of September 28, but a new time has not been confirmed.

Problems: N/A. The client has responded to the emailed questions as of September 21.

Weekly progress report - client response pending

Progress: The team emailed ten topics of requirements questions to the client on September 18 after the planned client meetings could not take place. The website and D1 draft now record the meeting status and questions. This is a progress update, not a meeting record.

Plans: The team proposed meeting the following week in the September 18 email; a new time has not been confirmed. The specifications can be revised once the client's answers arrive. Additional team assignments and weekly commitments have not been recorded.

Problems: Technical difficulties prevented both planned client meetings, and no response to the emailed questions has been received as of September 20. Requirements, priorities, and acceptance criteria remain unconfirmed.

Planned client meeting did not take place

Purpose: Determine specifications and requirements with Nick Dokich.

Problem and outcome: Technical difficulties on the client's side prevented the meeting. No discussion, requirements decisions, or meeting action items were recorded.

Follow-up: The team emailed requirements questions on September 18 and proposed meeting the following week. No response has been received as of September 20.

TA meeting - course expectations

Discussion: Reviewed expectations and the TA material. The supplied notes cover time management, early communication about contribution imbalances, weekly Progress/Plans/Problems reports, deliverable and demo status, version control practices, and project tracking.

Guidance reviewed: Keep the website current for manager review. The notes encourage AI assistance while requiring significant human revision and oversight of written deliverables.

Decisions and action items: No additional project-specific decisions, named assignments, or deadlines from this meeting have been supplied. The team-reported TA schedule is Tuesdays, 10:30-11:00 a.m.

Planned client meeting did not take place

Purpose: Determine specifications and requirements with Nick Dokich.

Problem and outcome: Technical difficulties on the client's side prevented the meeting. No requirements were confirmed and no meeting action items were recorded.

Website update

Updated the project page to align with course website expectations, including roles, contact information, meeting schedule, team rules, journal, related links, and deliverables.

Initial requirements draft

Captured the product objective, target users, workflow, input and output formats, and proposed open-source technology stack.

Project kickoff

Defined the problem space around color-separated logos, closed vector paths, local Windows execution, and CAD export needs.