Specifications
User stories plus functional, non-functional, interface, and other requirements.
Read specificationsDeliverables
D1-D5 milestones.
Open the final midterm presentation
Open the image vectorization tech talk and tutorial
User stories plus functional, non-functional, interface, and other requirements.
Read specificationsSystem architecture, component responsibilities, data flow, design boundaries, platform decisions, and the digital stencil workshop metaphor.
Read D2 design documentIdeal and semester testing scope, environments, automated suites, manual CAD checks, acceptance testing, test data, and schedule.
Read D3 test planOperator guidance for installation, upload, vectorization settings, review, export, warnings, and troubleshooting.
Read user manualFinal project source code, automated checks, sample artwork, and the current image-to-CAD development build are available in the public development repository. Final packaging and client handoff remain in progress.
Documentation plan identifies the information required by operators, installers, and future developers.
Client handoff plan describes packaging, installation, ownership, training, validation, and final delivery.